Tube 17
Container
Contains 98 Results:
The Trails Builder Walls Cantabria Parcel A-3; Trails Hollow Drive Elevation L-1.2, 1996 May 2
Item — tube: 17
Identifier: 4.28.3
Scope and Contents
Print and Pen on Mylar
Dates:
1996 May 2
The Trails Builder Walls Cantabria Parcel A-3; Snow Trails Elevation L-1.3, 1996 February 2
Item — tube: 17
Identifier: 4.28.4
Scope and Contents
Print and Pen on Mylar
Dates:
1996 February 2
The Trails Builder Walls Cantabria Parcel A-3; Snow Trails Elevation L-1.4, 1996 February 2
Item — tube: 17
Identifier: 4.28.5
Scope and Contents
Print and Pen on Mylar
Dates:
1996 February 2
The Trails Builder Walls Cantabria Parcel A-3; Trails Vista Drive Elevation L-1.5, 1996 May 2
Item — tube: 17
Identifier: 4.28.6
Scope and Contents
Print and Pen on Mylar
Dates:
1996 May 2
The Trails Builder Walls Cantabria Parcel A-3; Trails Vista Drive Elevation L-1.6, 1996 May 2
Item — tube: 17
Identifier: 4.28.7
Scope and Contents
Print and Pen on Mylar
Dates:
1996 May 2
The Trails Builder Walls Cantabria Parcel A-3; Anasazi Drive Elevation L-1.7, 1996 February 2
Item — tube: 17
Identifier: 4.28.8
Scope and Contents
Print and Pen on Mylar
Dates:
1996 February 2
The Trails Builder Walls Cantabria Parcel A-3; Anasazi Drive Elevation L-1.8, 1996 February 2
Item — tube: 17
Identifier: 4.28.9
Scope and Contents
Print and Pen on Mylar
Dates:
1996 February 2
The Trails Builder Walls Cantabria Parcel A-3; Details Sheet L-3.2, 1996 January 17
Item — tube: 17
Identifier: 4.28.10
Scope and Contents
Print on Vellum
Dates:
1996 January 17
The Trails Builder Walls Cantabria Parcel A-3; Details Sheet L-3.3, 1996 February 2
Item — tube: 17
Identifier: 4.28.11
Scope and Contents
Print on Vellum
Dates:
1996 February 2
Base Info Main Street, undated
File — tube: 17
Identifier: LVIII
Scope and Contents
From the Collection:
This collection contains the business records of Design Workshop, Inc. where each project is organized into its own series. The boxes and folders are arranged according to Design Workshop, Inc.'s original filing and coding system as indicated in the parentheses. The first number represents Design Workshop's filing code and the second number is the project number. The landscape architectural drawings are currently being processed, but a spreadsheet containing the inventory may be accessed by...
Dates:
undated