Tube 20
Container
Contains 197 Results:
Cucumber Creek, undated
File — tube: 20
Identifier: LXXVIII
Scope and Contents
From the Collection:
This collection contains the business records of Design Workshop, Inc. where each project is organized into its own series. The boxes and folders are arranged according to Design Workshop, Inc.'s original filing and coding system as indicated in the parentheses. The first number represents Design Workshop's filing code and the second number is the project number. The landscape architectural drawings are currently being processed, but a spreadsheet containing the inventory may be accessed by...
Dates:
undated
Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Title Sheet/Vicinity Map, undated
Item — tube: 20
Identifier: 2.19.5A
Scope and Contents
Blueprint on Bond
Dates:
undated
Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Plan and Profile Station, undated
Item — tube: 20
Identifier: 2.19.5B
Scope and Contents
Blueprint on Bond
Dates:
undated
Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Plan and Profile, undated
Item — tube: 20
Identifier: 2.19.5C
Scope and Contents
Blueprint on Bond
Dates:
undated
Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Plan and Profile, undated
Item — tube: 20
Identifier: 2.19.5D
Scope and Contents
Blueprint on Bond
Dates:
undated
Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Storm Drain Plan & Profile: Academy and North Bear Tributary Arroyo Desiltation Pond, undated
Item — tube: 20
Identifier: 2.19.5E
Scope and Contents
Blueprint on Bond
Dates:
undated
Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Plan and Profile, undated
Item — tube: 20
Identifier: 2.19.5F
Scope and Contents
Blueprint on Bond
Dates:
undated
Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); North Bear Tributary Pond, undated
Item — tube: 20
Identifier: 2.19.5G
Scope and Contents
Blueprint on Bond
Dates:
undated
Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Plan and Profile, undated
Item — tube: 20
Identifier: 2.19.5H
Scope and Contents
Blueprint on Bond
Dates:
undated
Construction Plans for High Desert Subdivision Phase 1-B-1 Storm Drainage (Academy Storm Drain); Storm Drain Plan and Profile: Academy Boulevard and South Bear Tributary Arroyo Desiltation Pond, undated
Item — tube: 20
Identifier: 2.19.5I
Scope and Contents
Blueprint on Bond
Dates:
undated