Item USU A-1083
     Container 
  
Contains 1 Result:
Installation of the S.A.T.C. at the UAC, October 1, 1918
     Item  — item: USU A-1083
  
      Scope and Contents
        
    Engineering Building (later the Education and English Building) under construction in the background. See also USU A-1518. See also Buzzer 1919, p. 142 ff.
        Dates: 
      October 1, 1918