Hunter II Project minutes, 1992 March 04-1993 December 15
Scope and Contents
Hunter II, part of the Hunter Station in Emery County, Utah, is a coal-fired, steam-electric generating unit with a net capacity of 446 megawatts. Hunter, jointly owned by PacifiCorp, Deseret Generation and Transmission Co-operative and UAMPS, has commercially operated since June 1980. UAMPS owns an undivided 14.582 percent interest in Unit II, representing 65 megawatts of capacity and energy.
Dates
- Creation: 1992 March 04-1993 December 15
Creator
- From the Collection: Utah Associated Municipal Power Systems (UAMPS) (Organization)
Conditions Governing Access
No restrictions on use, except: not available through interlibrary loan.
Extent
From the Collection: 118.5 Linear Feet (238 boxes and 165 digital files)
Language of Materials
From the Collection: English
Repository Details
Part of the Utah State University, Merrill-Cazier Library, Special Collections & Archives Repository
Merrill-Cazier Library
Utah State University
3000 Old Main Hill
Logan Utah 84322-3000 United States
435 797-8248
435 797-2880 (Fax)
scweb@usu.edu